NEOM Marine Jetty – Precast Works

FCC was selected to fabricate and deliver the precast concrete elements for the NEOM Marine Jetty, a critical infrastructure component within the Red Sea development. The project required advanced engineering and a specialized concrete mix design to ensure long-term durability and resistance to the marine environment.

Scope of Precast Elements:

  • Precast Cross Beams.
  • 20-meter Precast Girders.
  • Column Crowns.

All elements were designed, cast, and delivered by FCC with precision, adhering to stringent quality and durability standards to meet the high expectations of the client and the challenging coastal conditions.