Country

Ksa, Umluj

Client

SARCO / Red Sea Global (RSG)

Completion Period
6

months

Shurayrah Bridge Project – GRC and Precast Works

FCC was entrusted with the full scope of GRC and precast works for the iconic Shurayrah Bridge, a landmark development within the Red Sea project. Our scope included the design, production, delivery, and installation of both structural and architectural precast elements.

Scope of Work

  • Permanent Bridge Precast Cladding.
  • Precast Pedestrian Bridge Structure.
  • Architectural Cladding.
  • GRC Feature Works.

FCC’s engineering and production teams successfully delivered high-precision components tailored to meet the unique architectural vision of the project, achieving the required quality, durability, and aesthetic standards for this high-profile destination.